LBS has worked in association with Bowmer and Kirkland Ltd by supplying and fitting 12 steel door sets, some of which are SR2 rated, whilst others are fire rated and multiple louvre systems at the Porter Building in Slough.
Located directly opposite Slough Station, across the newly developed part-pedestrianised square, The Porter Building provides a new, high-profile landmark building that embodies Slough’s progressive business nature.
The Porter Building in Brunel Way has become the first building in the UK to achieve the WELL Building Standard.
The WELL Building Standard is an international performance-based assessment grounded in medical research, which focuses on human health and wellbeing in the built environment. The standard has become a key marker of new office design in the US, and an increasing number of under-construction UK office developments are registered for the rating. But The Porter Building is the first in the country to achieve WELL Core and Shell certification, attaining a rating of Gold, the second highest possible.